Day-0 Explorer
General enterprise visibility, with access to the enterprise's general document spaces. No HR or payroll compartment access.Viewing as Enterprise Reader

3 linked source records

Operational links are what integration connected. They are not entity resolution, and the two stay separate.

Operational links

2 links
  1. MES · Material Consumption

    #3

    Quantity: 4

    Event Time: 16 Jul 2026, 06:20 IST

  2. Material Consumption → Material IssueIntegration relay · link status ACTIVE
  3. ERP · Material Issue

    MI-2026-000004 · PST

    Production Order: PROD-2026-000003

    Issue Date: 16 Jul 2026

  4. Material Consumption → Material IssueIntegration relay · link status ACTIVE
  5. MES · Material Consumption

    #4

    Quantity: 2

    Event Time: 16 Jul 2026, 07:40 IST

Each step is an existing operational link; the order shown is connection, not a claim about when things happened.

Link records
  • source_link_id
    5ef21f37-3986-4f0e-9d19-0107ce617c8c
    relationship_type
    MATERIAL_CONSUMPTION_TO_MATERIAL_ISSUE
    from_source_record_id
    3
    to_source_record_id
    a8a10bb1-e25a-4a52-b0ff-dd6e29e16f02
    link_method
    INTEGRATION_RELAY
    confidence
    status
    ACTIVE
    created_at · recorded
    2026-09-13 12:48:24.70697+00
    updated_at · recorded
    2026-09-13 12:48:24.70697+00
  • source_link_id
    62715e03-e32c-4054-b4b5-1c96bcecbdad
    relationship_type
    MATERIAL_CONSUMPTION_TO_MATERIAL_ISSUE
    from_source_record_id
    4
    to_source_record_id
    a8a10bb1-e25a-4a52-b0ff-dd6e29e16f02
    link_method
    INTEGRATION_RELAY
    confidence
    status
    ACTIVE
    created_at · recorded
    2026-09-13 12:48:24.70697+00
    updated_at · recorded
    2026-09-13 12:48:24.70697+00