Production Order → Work Order
Operational links are what integration connected. They are not entity resolution, and the two stay separate.
Operational links
1 linkERP · Production Order
PROD-2026-000001 · CMP
Item: ITM-FG-RACK · Metrolane roof rack, assembled
Planned Qty: 10
- Production Order → Work OrderIntegration relay · link status ACTIVE
MES · Work Order
MES-WO-2026-000001 · COMPLETED
External ERP Production Order Ref: PROD-2026-000001
Completed Good Qty: 9
Each step is an existing operational link; the order shown is connection, not a claim about when things happened.
Canonical context
- ERP Production Order PROD-2026-000001 projects to canonical Production Order PROD-2026-000001
- MES Work Order MES-WO-2026-000001 projects to canonical Production Execution MES-WO-2026-000001
Canonical context corroborates the journey; it does not replace the operational links.
Scenario context
- SCN-X07 Production dispatch lag
- PROD-2026-000001 · Comparison case · dispatched as MES-WO-2026-000001
Link records
- source_link_id
- e6dee6eb-cd16-4df8-bca6-6b028bde74f7
- relationship_type
- PRODUCTION_ORDER_TO_WORK_ORDER
- from_source_record_id
- 2ebc4956-78e0-452a-b91b-556021c9670c
- to_source_record_id
- 1
- link_method
- INTEGRATION_RELAY
- confidence
- 1.00000
- status
- ACTIVE
- created_at · recorded
- 2026-09-13 12:48:24.486311+00
- updated_at · recorded
- 2026-09-13 12:48:24.486311+00