Day-0 Explorer
General enterprise visibility, with access to the enterprise's general document spaces. No HR or payroll compartment access.Viewing as Enterprise Reader

Production Order → Work Order

Operational links are what integration connected. They are not entity resolution, and the two stay separate.

Operational links

1 link
  1. ERP · Production Order

    PROD-2026-000002 · RUN

    Item: ITM-FG-RACK · Metrolane roof rack, assembled

    Planned Qty: 5

  2. Production Order → Work OrderIntegration relay · link status ACTIVE
  3. MES · Work Order

    MES-WO-2026-000002 · IN_PROGRESS

    External ERP Production Order Ref: PROD-2026-000002

    Completed Good Qty: 0

Each step is an existing operational link; the order shown is connection, not a claim about when things happened.

Canonical context

  • ERP Production Order PROD-2026-000002 projects to canonical Production Order PROD-2026-000002
  • MES Work Order MES-WO-2026-000002 projects to canonical Production Execution MES-WO-2026-000002

Canonical context corroborates the journey; it does not replace the operational links.

Link records
  • source_link_id
    96053931-90b9-47fa-b9db-e82f07da0b21
    relationship_type
    PRODUCTION_ORDER_TO_WORK_ORDER
    from_source_record_id
    ecc8f095-feac-4838-8f78-dbb67af1e686
    to_source_record_id
    2
    link_method
    INTEGRATION_RELAY
    confidence
    1.00000
    status
    ACTIVE
    created_at · recorded
    2026-09-13 12:48:24.576953+00
    updated_at · recorded
    2026-09-13 12:48:24.576953+00