Alert → Downtime Event
Operational links are what integration connected. They are not entity resolution, and the two stay separate.
Operational links
1 link- Alert → Downtime EventIntegration relay · link status ACTIVE
Each step is an existing operational link; the order shown is connection, not a claim about when things happened.
Scenario context
- SCN-X09 IoT/MES event ordering
- 3 · Comparison case · opened by the relay from ALRT-2026-000003
Link records
- source_link_id
- 4da5b080-4057-449f-b145-f91b025229c7
- relationship_type
- ALERT_TO_DOWNTIME_EVENT
- from_source_record_id
- 3
- to_source_record_id
- 3
- link_method
- INTEGRATION_RELAY
- confidence
- 1.00000
- status
- ACTIVE
- created_at · recorded
- 2026-09-13 12:48:24.858412+00
- updated_at · recorded
- 2026-09-13 12:48:24.858412+00