EKA ExamplesReal runs · recordings and screenshots

A policy version on a date

UNAVAILABLEAbsence and limitsEKA-CUR-011

Five readable passages, and a question about a date none of them records.

The question

Which version of the warranty policy was effective on 2026-07-15?

A replay of the captured run through the EKA Workspace. No model is called in replay. The run is CUR-011 of the curated suite, graded GOLDEN.

What it looks like

Recorded walkthrough

34 seconds, without sound, in replay. The transcript below describes it.
Transcript
  1. The question is typed and sent: Which version of the warranty policy was effective on 2026-07-15?
  2. The activity rail runs, then the answer arrives with its result: UNAVAILABLE.
  3. The answer reads: Based on the provided runtime notes, the effective date for any document (canonical.Document.EFFECTIVE_AT) is NOT_SUPPORTED, as document versions carry no effective-from/effective-to dates. Therefore, the evidence does not establish which version of the warranty policy was effective on 2026-07-15.
  4. The steps are opened: Searching documents · COMPLETED · Writing the answer · COMPLETED.
  5. The evidence is opened: 5 items.
  6. The view returns to the answer.

Screenshots

Four moments of the run, one tab each.

The question, as entered — EKA Workspace replaying the captured run for “Which version of the warranty policy was effective on 2026-07-15?”
The question, as entered
The activity rail, mid-run — EKA Workspace replaying the captured run for “Which version of the warranty policy was effective on 2026-07-15?”
The activity rail, mid-run
The answer and its result — EKA Workspace replaying the captured run for “Which version of the warranty policy was effective on 2026-07-15?”
The answer and its result
The evidence, expanded — EKA Workspace replaying the captured run for “Which version of the warranty policy was effective on 2026-07-15?”
The evidence, expanded

Where it is explained

EKA Guide 11 — A policy version on a date