ERP
Production Orders
What ERP planned to make, and what was completed.
Loading…
ERP
Loading…
4 production orders
Item and Plant are not offered as filters here: only one value of each is recorded across the collection.
| Key | Status | Item | Planned Qty | Completed Qty | Canonical record | Reaches |
|---|---|---|---|---|---|---|
| PROD-2026-000001 | CMP | ITM-FG-RACK · Metrolane roof rack, assembled | 10 | 9 | PROD-2026-000001 | MES MES-WO-2026-000001 |
| PROD-2026-000002 | RUN | ITM-FG-RACK · Metrolane roof rack, assembled | 5 | 0 | PROD-2026-000002 | MES MES-WO-2026-000002 |
| PROD-2026-000003 | CMP | ITM-FG-RACK · Metrolane roof rack, assembled | 4 | 2 | PROD-2026-000003 | MES MES-WO-2026-000003 |
| PROD-2026-000004 | REL | ITM-FG-RACK · Metrolane roof rack, assembled | 4 | 0 | PROD-2026-000004 | None recorded |